Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

If IGRINS was recently opened in the cleanroom, then a larger roughing-pump will be required to get started (taking 36-72 hours).

...

Let the cryostat warm to ambient temperature and document the pressure on the pressure gauge.

Plug the vacuum pump into UPS power.

...