This procedure is discussed in the decon and CTI 1050C manuals on this page: IGRINS Cooling System Information
In Summary:
1) Operate the coldhead for 1-3 hours. This freezes, the contaminants out of the helium circuit and into the coldhead.
2) Shut down the helium compressor and immediately connect the maintenance manifold in its place. We try to disconnect the hoses at the coldhead to use the short hoses and reduce helium gas waste. If short hoses are not available, then disconnect at the compressor and install the manifold there.
3) Reduce the pressure in the coldhead to 30-50 psig. Don't go below 30 psig.
4) Allow the second coldhead stage to warm above 275K. This temperature is tracked in the electronics rack. Expect to wait 12 hours.
Note: This is a good time to put IGRINS on the vacuum pump. Once the coldhead is clean, cooldown can immediately start if IGRINS has been on the pump for at least 2 hours.
5) Attach the regulator to the helium tank and purge the line for 10 seconds. Attach the fitting to the regulator with gas flowing.
6) Now you can clean the coldhead:
The cooldown can be started if IGRINS has been on the vacuum pump for at least 2 hours.