THIS PAGE IS IN DRAFT FORM
All student film productions must upload a signed Production Approval Form at least two business days prior to equipment checkout.
***Productions without signed and uploaded approval forms will not be cleared to pick up equipment***
Step 1. Fill out a [Production Approval Form].
Step 2. Send your shooting script and completed Production Approval Form to your faculty advisor/instructor to schedule a Pre-Production Meeting.
Step 3. Take a printed copy of the completed Production Approval Form to your Pre-Production Meeting and discuss your production plan.
Step 4. Both you and your instructor should sign the Production Approval Form at the end of your Pre-Production Meeting. If your instructor answers NO to question 20, skip to Step 6. If your instructor answers YES, continue to Step 5.
Step 5. Schedule a meeting with Keefe Boerner and get his signature on page 2 of the Production Approval Form.
Step 6. Scan the signed form and save it with the filename: yyyymmdd_PAF_LastnameFirstname (Note: yyyy_mm_dd = equipment pick up date).
Step 7. Upload the completed and signed Production Approval Form to the appropriate folder hyperlinked below:
RTF 340 Music Video
RTF 343 Adv narrative
RTF 366K Narrative Production
RTF 366K Social Media Production
RTF 366K Documentary Production
RTF 366k Latinx Filmmaking
RTF 369 Script to Screen: Movies
RTF 881KA Grad Doc
RTF 881KB Grad Narrative
RTF 488M Grad Pre-Thesis
RTF 488M Grad Thesis
***Production Approval Process must be completed at least two business days before your equipment check out***