Phase 7
Phase 7 – Plan Approval
There is no glossary or interview form for phase 7. Instructions, such as they are, are included here as well as an attachment (word document) for reference.
Phase 7 is plan approval. Each plan, once complete, must be approved by CNS OIT and by the unit head (Chair, Director, etc).
Once a plan is approved, a paper copy will be created to be stored by the unit, and a second paper copy will be created to be stored by the college. These paper copies are in addition to the on-line electronic version. Additional copies can be created if desired (to store at data centers, etc). All hard-copies must be appropriately protected to ensure the integrity of the document and the confidentiality of any data in the document.
Downloadable Documents
DRP-Interview-Form-Instructions-Phase-7.doc
DRP-Interview-Form-Instructions-Phase-7.pdf