[WIP] Power Systems Dependency Tree
The following document specifies Power Systems dependencies on other systems (i.e. what needs to be done for a Power Systems project to continue development).
Electrical Dependencies:
System | What is blocked | Reason for dependency | Danger level |
---|---|---|---|
BPS | High Voltage Testing - load testing | BPS needs to be thoroughly tested with the battery and able to close and open HV+ and HV- contactors robustly and conclusively. HV+ and HV- contactors determine the batteries involvement with powering the rest of the high voltage design, thus testing is delayed until then | Minimal |
Power Gen | High Voltage Testing - Battery charging | Array and MPPTs need to be completed to test battery charging. | Minimal |
Data Acquisition | PDU Power Monitoring and Recording | Data Acq’s system architecture (data pipeline for CAN) needs to be complete for us to utilize their systems. | Minimal |
Mechanical Dependencies:
System | What is blocked | Reason for dependency | Danger level |
---|---|---|---|
Emech | Board integration | Universal enclosures and wire integration needs to be decided before Power Systems board integrations. | Minimal |
Welcome to the University Wiki Service! Please use your IID (yourEID@eid.utexas.edu) when prompted for your email address during login or click here to enter your EID. If you are experiencing any issues loading content on pages, please try these steps to clear your browser cache.