2024-01-28 Workday Log

2024-01-28 Workday Log

Name

What They Did

Name

What They Did

Philip

 

Suspension

 

Andrew

  • got feedback from jacob/nathan on wishbone manufacturing plan

  • trained dyn ppl on manual mill

Kadhir

 

Kayla

 

Unsprung

 

Gerard

  • continued to prepare to manufacture axles

    • addressed all of the remaining problems with the manufacturing plan

    • finalized dimensions and tolerances

    • helped measure inner diameter of bearings and hubs

    • watched single point thread cutting videos

    • got feedback from Jacob and Nathan on plan

Steven

 

Sami

  • Face the wishbones down to .5" → Kadhir later took over. 

  • Discussed the manufacturing plan for uprights with Nathan, Jacob, and Harshit. 

  • Learned how to use the Manual mill. 

Harshit

  • Read Mathew's design guide about unsprung

  • Got feedback from Jacob/Nathan on Uprights manufacturing plan

Steering

 

Luis

 

Anh

 

Katy

N/A

Evan

 

Frame

 

Kaitlyn

 

Josh

  • Learned how to use manual mill and roughed aluminum steering stopper plate

Noah

  • Trained on the manual mill by Andrew where I began the fabrication of the steering stop plate