2/17/2024 EM Workday

2/17/2024 EM Workday

WH:

  • CAD for BPS

  • HV Cabling and fitting for Battery Box

Enclosures:

  • John/Ajay/Javi

  • Cut some more L-brackets that were aligned to the holes on the battery box, bent them all to a 90 degree angle and attached all L-brackets to the corners.

  • Also marked but have not cut any holes on the bottom panel of the BB to attach L-brackets.

  • We be integrating with the power systems team.

Cooling:

  • BB CADS DONE

  • Low and Med Mesh, and 4in duct product found

  • Mesh and duct attachment method found 

  • Ansys Progress