[wip] 2022-24 BPS Setup Steps
Step-by-step guide
Safety first
BPS Leader setup guide:
GitHub: https://github.com/lhr-solar/BPS-LeaderPCB/tree/master
PCB: https://github.com/lhr-solar/BPS-LeaderPCB/blob/master/BPS-LeaderPCB.PNG
Connect 12V and GND to J6
Don't turn the power on until setup is complete
A green LED next to the buck converter will indicate that 5V power is connected
Connect Amperes to BPS-Leader
J8 of Leader connects to Amperes
J2 of Amperes connects to Leader
Connect Leader J8 to Amperes J2
Connect the Minions to Leader
There are three minions but IsoSPI is daisy-chained so only one Minion needs to be connected to the Leader
Connect J5 of the Minion to J7 of the Leader
Connect nucleo (Flashing and debugging code on an MCU)
J5 is the SWD connector
Battery Voltage tap setup guide
Check the voltage of the voltage taps
We want to ensure that the voltage taps are properly connected
Measure the voltage between each connection through a multimeter (should be close to 3.5V)
Ensure that the probes don't touch
(WIP)Battery Temperature tap setup guide:
(WIP)BPS Amperes setup guide
(WIP)BPS Minion setup guide:
Schematic: https://github.com/lhr-solar/BPS-MinionPCB/blob/master/BPS-MinionSCH.pdf
PCB: https://github.com/lhr-solar/BPS-MinionPCB/blob/master/BPS-MinionPCB.PNG
use the power switch on the Minion to turn off the Minion
Find the GND of the Minion board (on J2)
Plug the Voltage connectors into J1 and J2
Ensure that you know which wire is GND (usually indicated by a different color)
Connect the minions
The minions are daisy-chained
J5 is the In connector and J6 is the Out connector
Connect the Out of one Minion to the In of the next minion