Plasmatherm #2
Nick's Notes:
Plasmatherm II Training (2).pdf
David's Notes:
- Left chamber is for etching Si and Right is for etching SiO2 and Si3N4
- Chambers are left in vacuum. Must vent to load
- utilities → select active → (select right/left)
- **if vent is greyed out, press standby on bottom left, then go back to select vent**
- **if this still doesn't work, press on, then standby**
- Cleaning
- wipe down stage and showerhead with water or IPA on a clean wipe
- only wipe showerhead in one direction.
- Close chamber then pump down to low vac
- utilities → pump chamber → low vacuum
- O2 clean - should always perform O2 clean before using the tool and 5 min O2 clean after 45 min of use
- process → load
- select "o2 clean.prc" recipe in main recipe folder
- process → load
- wipe down stage and showerhead with water or IPA on a clean wipe
- Running process
- Find recipe in
- **if any problems arise, click "end step" until out of problem step, not abort **
, multiple selections available,