Plasmatherm #2

Plasmatherm #2

Nick's Notes:

David's Notes:

  • Left chamber is for etching Si and Right is for etching SiO2 and Si3N4

  • Chambers are left in vacuum. Must vent to load

    • utilities → select active → (select right/left)

    • **if vent is greyed out, press standby on bottom left, then go back to select vent**

      • **if this still doesn't work, press on, then standby**

  • Cleaning

    1. wipe down stage and showerhead with water or IPA on a clean wipe

      • only wipe showerhead in one direction.

    2. Close chamber then pump down to low vac

      1. utilities → pump chamber → low vacuum

    3. O2 clean - should always perform O2 clean before using the tool and 5 min O2 clean after 45 min of use

      • process → load

        • select "o2 clean.prc" recipe in main recipe folder

  • Running process

    • Find recipe in

 

 

  • **if any problems arise, click "end step" until out of problem step, not abort **