RT-440 Cross-Industry lessons to advance capital project delivery

RT-440 Cross-Industry lessons to advance capital project delivery

Launched: 2026 (Kickoff at the CII ARC, 2026) - Expected Completion: 2028 (with a one-year initial phase to be extended based on success of the first year)

Research Questions and Objective

Investigate how other industry segments engineer and execute projects and products with the goal of identifying opportunities for step change in planning, engineering, and execution of capital projects.

Question: What are the core principles and practices adopted for project and product engineering and production/execution in key industry segments (including but not limited to aerospace, automotive, shipbuilding, commercial construction, and military projects) that can be translated to the unique requirements and constraints of heavy industrial capital projects?

Background

CII members desire to identify ways to drive step changes in the industry by looking at how different industry segments structure their business and production processes.

Hypothesis

Capital projects can achieve improved predictability, scalability, and performance by adopting product-oriented, industrialized production principles from adjacent industries—when those principles are properly translated to the capital project context.

(Expected) Outcomes

  • Cross-industry cases (using primary data rather than literature review only) published as cases are completes (2+ in year 1, and 2+ on year two)

  • Paper with strategies and insights for the capital projects industry 

  • Presentations that CII can use to position these ideas in events across different segments 

Scope

Dimension

Included

Not Included + Notes

Dimension

Included

Not Included + Notes

Industry Segments (served by results)

Heavy and Light Industrial, Buildings, Infrastructure

All segments are considered initially. Those best aligned with specific approaches will be identified as part of the work.

Industry segments to be explored

Six segments in Year 1 (list to confirm). Industrialized construction reframed as industrial buildings and architecture.

Year 2 deep dives selected via an applicability framework. (Updated 10/26/26)

 

Relation to CII past research

Shipbuilding research

How new concepts integrate/connect to CII practices?

Detailed workflows on how concepts work with CII practices

Technology awareness scope

TBD

This is not a project about management software or specific IT topics.

Core concepts (potential)

Productization, Modularization, Standardization, governance models, delivery models, supply chain integration (each of which may become a dimension of the project), Configurators (parametric models), DfMA.

Product Interim Database (past research)

Production System Boundaries

“Production system” boundary to be defined at the 11/20/26 workshop.

 

Unit of analysis

Industry segment: product or project (e.g., F150 project)

 

Validation

 

Quantitative validation of the impact of proposed approaches

Methodology

Step

Data/Inputs

Analysis/Methods

Results

Step

Data/Inputs

Analysis/Methods

Results

1

Year 1

 

 

 

2

Scoping and Industry Selection

Lit. Review

Interviews (AI and traditional)

Selection criteria TBD

Selection method TBD

Selected segments (1-3) OR is it products/projects?

Guiding questions

3

Segment exploration

Selected segments/products or projects (?)

Guiding questions

Interviews

Walkthroughs?

Segment exploration template (segment, strategies, why used, how long)

Case study methodology TBD

Qualitative analysis / tagging method TBD

Context qualifiers

Enablers/inhibitors

Productization / Production methods

Barriers

 

4

Definition of Production System Framework

Initial cases

Workshop (process TBD)

Framework to guide the data collection phase

5

Cross-segments / cross-case analysis

Individual segment data

Production system framework

Method to identify impact on capital projects TBD

Diffusion characterization criteria and methods TBD

 

Production method with highest potential for capital projects

Necessary changes

Short publications (by case of segment)

Summary matrix for all segments

Characterize diffusion potential across CII segments

6

Synthesis

Step 5 outcomes

 

Document with short overview per industry segments (or alternatively by production system aspect).

7

Yea 2

 

 

 

8

Deeper Case Study

Selection criteria

Initial case studies

Additional data

Data collection framework

 

Deeper case Studies

9

TBS

TBD

 

 

10

Framework Development

TBD

 

 

Milestones

  • Kickoff meeting: July 2026

  • Research Forum: April 2027 (Austin, TX)

  • Year one papers: August 2027

  • Final report outline: January 2028

  • Final presentation: July 2028


Roster

See the official roster on the RT webpage at the CII website