Building Report

Building Report

Updated 5/6/20 - JVS

General Information

Building reports give a snapshot report of all the classes scheduled in a specific building throughout a semester. These can be used during production phase, and can also be provided to someone interested in knowing at what time courses take place in a building during the semester. Building reports are initiated using the mainframe, and they will discharge to the Scheduling Server.

How to Run a Building Report

  1. Log into the Mainframe

  2. Choose 'ST'

  3. In the enter input field, type 'txtask' and press <enter> 

Figure 1

  1. Fill in the following information, then press <enter>

    • In the "Command" field, enter 'SSJ'

    • In the "Name" field, enter 'RGJGSCH5'

    • In the "Version" field, enter 'P'

    • In the "Dept" field, enter 'RG'


Figure 2

  1. Press <enter> to scroll to the second screen. You are looking for the job option: RGNWBLDG. To select it, place an 'y' next to the name.

  2. Do not change the run class. Leave it as "A" and press <enter> 


Figure 3

  1. Overwrite the following fields and press <enter>:

    • CCYYS with CCYYS in question

    • Building abbreviation

    • To run the job for all GPCs enter ‘*’ into the building field

  2. Press <enter> to confirm that you want to submit this job

  3. The job name and job number will pop up- this confirms that you have submitted your job. Press <enter> one more time to continue.

  4. If you were just running a report for a single building, you are done!

    • If you are running reports for every building that contains GPCs, clear once to leave that screen.

      • TIP- type "SSM" into the command field to clear back to original screen

    • You will then need to re-enter "SSJ" into the command field, but can leave the other fields untouched.


Figure 4

  1. Repeat steps 1-11 for any remaining additional buildings for which you need reports

  2. Building reports will pop out on the Scheduling drive in Excel format