2024-2026 Fergo (Body) Documentation

This serves as the central hub of documentation for the 24-26 Solar Vehicle's Body System.


Search Body Documentation



Starting Places:

/wiki/spaces/LHRSOLAR/pages/131107528

Frame 101: A Guide to the Frame Subsystem

Ergo 101: A Guide to the Ergonomics Subsystem

Design Documentation:

High Level Dependency - Fergo

Workday Plans:

Frame Workday Plans

Manufacturing Documentation:

TBA

Team Photo:

TBA

Team Tidbits:

TBA