Quantum Dots Synthesis Hood Set Up
This page will document the setup of the quantum dots synthesis hood and the equipment utilized.
General Setup
(Schlenk line and nearby equipment with pictures)
Materials and chemicals used can be found here (link to excel with updated materials used.)
Maintenance
The Schlenk Line stoppers must be vacuum greased once a week (use cable ties to clean the holes from vacuum grease).
, multiple selections available,