5/14
figure out what is worth fixing
str
only the hex couple connecting to the wheel will be changed, welding not an issue
i will cad new quick disconnect
josh will buy 7075 and 6061
josh will do hand calcs to figure out by 5 days from now
should tell ergo that QD is changing
gerard: last time he touched str was spring break: lower one alr remade, just upper to be made now
drill thru u joints yes, just clamp it well on the mill
kayla finish daybreak redesign by 5/22
pillow blocks: machine a simple spacer + reduce the height of top block
cotter pins
suspension
currently only replacing 1 shock. concern: affects handling, would unbalance?
can we buy new shock from jenson usa?
how is pushrod mount being connected to bottom CA? bracketed? welded? but no one here to weld alu. bracketing is prolly quicker but need to do analysis on strength, andrew can do
have jacob contact emily if gerard cant help
jacob miight come to comp
waiting for kayla to finish ca design, then sendout waterjet order, then postmachine + do grooving for spherical bearing
upper ca selected spherical bearing has larger ID than 1/4"?
motion ratio length is smth kayla
only front CAs are changing, not rear ig? confirm with kayla
new shock coming when? ask michael
CA stock maybe needed to send to lee for waterjet
current shocks 7.875 eye to eye, 2.25 travel
shock we ordered can be returned within 30 days of ordering. when did michael order? like 2.5 wks ago.
unsprung
getting a new motor rotor from china bc brake pad is not making full contact
safety wiring: how much do we need to do? for all critical fasteners, which is all dyn fasteners that dont use flex top lock nuts. and all blind holes.
hand brake: teeth are dull, bar is bent, rubber band replace w spring? josh
bolt holes in small bolts for safety wiring, should be carbon steel
buy washers once new rotor has arrived from china
need to disassemble calipers and oil the pistons, bc they dont fully retract after powered run
banjo bolt- either buy bolt or replace with front left, depending on if parthiv wants the pressure sensor. follow up with parthiv in a few days.
ic might have safety wire drilling jig that can clamp into vice
to dos:
cesar send pics + take measurements of new quick disconnect -> i cad it and cad the new upper steering shaft (steel)
josh will buy 7075 and 6061
josh will do hand calcs to figure out by 5 days from now
josh check for new shock arrival
andrew do analysis on bracketing pushrod mount to bottom CA
cesar ask jacob to ask emily if she can help weld pushrod mounts (likely last wk of may/first wk of june)
me ask philip if we need to buy ca stock to send to lee for waterjet
me and josh will measure bolt hole diameter and machine bolt holes tmr
josh next time he goes to pickle: 1) take closer look at handbrake issue 2) if this seems like a valid solution, bring hand brake upper bar to etc to grind it sharper
andrew - few days from now, follow up with parthiv on banjo bolt/pressure sensor needed in front left?
josh will ask electric if theyre getting keys this wknd. our cohort leads are philip gerard kenta harshit
POWERED RUN: dynamics nothing changes for powered run except new shock if it comes in
5/28
currently at pickle, did test fit of lower str shaft.
redo the spacer (make it like 0.760 then go down by thou and test fit)
lower shaft OD perfectly fits in bearing, OD = 0.6235" -> keep in mind for upper shaft
TAKE THE RACK OFF BEFORE U LEAVE
take all pillow blocks before leaving
from kayla call:
coordinate whether we can make new rod ends
all bottom rod ends too big
pick new rods ends ( first check if we have any)
control arm status: how to do it matrix method with non 2 force members
Clevis pin holes on lower shaft need to be 10 degrees offset
5/29
assemble wheels down and check how brake disc fits in calipers
cad control arms & send to jacob, then do truss solver, then do tiny bit of research -> asked kayla
check CAD for str shaft exact eye to eye dims, shows 7.202? asked gerard
bolted joint str
helicoil selection
notes
new stock should be coming early next week
info i need rn for truss solver:
daybreak weight w driver
daybreak shock eye distance at: resting, max bump, max droop,
truss solver issues: no points for new str rod (IB & OB) OR current str rod (6 #s)
str wheel thickness: 0.130"
hole depth: 0.476"
OD: 0.997 / 1.004" -> make 1"?
coupler ID: 0.629"
drill 0.25" thru hole
decided to wait till later to worry abt the brake interference thing
tmr morning to do
machine new sleeve- L=1.0", OD= 0.760- (test fit), ID= 9/16"
machine str wheel QD stopper
check grooving tool thickness in axle box in garage and tell cesar
5/30
to do today
put lower str assem on car and check that it works
ONCE U GET BACK check grooving tool thickness in axle box in garage and tell cesar- its in mill tools box in garage
send recording link to dyn once it works
get kaylas measurements - got all the ones we could
notes
dyn meeting notes
FDR 7/30
did eplan interview
to do next
go thru past recordings / notes
Read Philips msg and Kayla’s recording
check box for shorter QD bolts
talk to cesar abt manufacturability his CA design
get vise measurements on monday for CA design
6/2
str saft dims
1.65-1.71
1.49 + 1.07 + 1.65
bring back tn: both bearings, u joint, rack
Call w kayla notes
feedback on the hardware which was the CA blocker
bearings small enough to fit in upright but w large enough misalignment
she wants to downsize rod ends, what are my thoughts so she can do calcs
to dos for meeting:
settle on CA geometry
manufacturability: misumi, ask jamie if we can have saturday hours
to do tmr:
check box for shorter QD bolts
grooving tool width
start making new tie rods and toe rods for current suspension
postmachining for pedal box, make spacers, groove for pedal face
test boring and grooving on rotary table
6/3
Today:
give Philip feedback on his CA design
Clevis pin: 0.241
Middle shaft hole (upper): 0.253
Adavit explain pedal box stuff
Notes
cesar says str wheel fasteners need to have 2 threads sticking out but i noticed thats not possible bc it prevents the QD from coming off
Tmr:
make pedal box stuff
make tie rods
make clevis pin (L=1.64, head thickness=0.0875 non head length=1.553, head OD=0.366, pinhole ID=0.108)
aero spacers important dims: ID, axial face is flat, and distance between flanges
philip
kaylas was just a 2d profile
arch stronger than triangular
blind hole better than thru hole
6/5
cesar/advait comp last yr: shell to frame attachment broke 3 times but we redid the attachments (stronger + more of them) so that shouldnt happen now
shocks questions to answer in order
does pump work?
how much pressure drop from removing pump?
are we 100% sure all shocks (FL esp) dont leak? test them under multiple conditions to be sure
currently there are no leaks bc recently all rebound settings were put to max positive and all stiffness was put to something (so all shocks on same setting now)
all measurents were made w wheels down
we have to buy a a second shock asap if that one is leaking
pressure vs ride height relationship? find thru testing
does it work thru its intended range of travel, if not what are the issues?
if time it would be nice to characterize these shocks, maybe theres a way to do it by using the current car assembly as the testing setup
tmr:
rotary table testing, record w josh
tap RTH hole for one tie rod
Harshit takeaways from comp last yr
str extenders bend bc gerard forgot need 2 lock nuts to prevent bending, just need to write everything down even the small things
most time was spent assembling stuff made right before we left
pressurize shocks before putting in trailer otherwise no dampening -> stress goes straight to dyn system BAD
worked well: night shift, day shift ppl, good for doing hella work
dyn test is last test after everything has passed
dyn issues: mit tipped, doing it in time figure 8 and circle are fine, slalom is the issue
tires: bead blaster for tires makes inflation ez
bring the right tools (9/16 wrench esp)
try to bring tools that can cut metal easily, angle grinders, level surface (mini table?)
got new bent tubes for roll cage from some fencing company
BRING WELDER
6/6
notes
shocks
bolted joints
think thru each operation of ca manufacturing and see if its possible
consider str angles in CA geometry
Call w kayla notes
talk to cesar abt what he's doing and take str cad from him
brake rubbing: hammer the calipers
kayla: prioritize brakes, CA, pedal box
philip consider str angles?
do tipping calc? for ride height
if bump stop is too high then we reduce travel in design
if need to change RH, lower RH -> changes CA ->
find shock compression & ride height w and wo driver in it
get estimate on shell deflection if we happen to put it on
rn static is 250, get travel till bump stop
at 180 w battery what is rh and travel till bump stop
roll center to cg is kinda high but what is it
kinematic dont matter j need parts on car
6/7
to dos before going to pickle tmr
talk to cesar abt what he's doing and get str cad from him
get rulers
overall do to dos
bolted joints
suspension measurements (think thru)
CA manufacturing thinkthru all ops: clamping (flat faces needed where), tool interference, are certain features/profiles hard to do (look at cad), WHAT TOOLS we using (maybe practice boring on lathe?)
6/8
notes
organization: our stuff in garage rn, plus toolbox in hallway
Upper shaft sticks out 1.611” from bearing face (inner)
Look at cesar CA cad and give feedback on manufacturability
Tmr:
Machine Gerard spacer L=1.71”
Boring operation
Make lower shaft spacer (bring lower shaft) length 1.56 at least 1.75 ideal ID>0.587
Str arm spacers 4x ID .25 OD length=0.300” steel OD= .35-.400
waterjetting stuff
dxf doesnt transfer units over
we dont know if lee has stock - he does for CAs
CA maybe
seatbelt tabs yes
str wheel no?
pedal box no bc need 1/4 in
batt box pins
tmr:
square stock for seatbelt tabs
boring op
reduce lower shaft spacer OD
cut the stock for battery box pins
check grooving tool depth (radial)
6/10
today pickle:
find min stock size to order for waterjetting (pedal box, batt box pins, seatbelt tabs)
6/11
size helicoils
ca manufacturing plan
bolted joint analysis
6/12
tmr:
cut 4130 plates to 1/4" thicknesses
rotary table nut wrench sizes: 1/2, 9/16, 11/16, 7/8
6/13
cesar will weld tmr, needs practice stock, ill bring the spacer from my apt
tmr: ask ic where their body cabinet is for helicoil kit
6/14
sizing remaining hardware today
bolts??
ended up sizing all hardware, practiced helicoiling a 14-28 rht hole (used drill at pickle)
worked w cesar to make sure the CA cad works w the ret rings we chose to not have interferences/reduced misalignment
6/15
figure out pedalbox spacers to machine
Spacers needed for pedal box: (all aluminum)
5x .5265 OD .3125 ID, .5 inches in length
2x .5265 OD .3125 ID, .25 inches in length
6/16
check if ic has lh 1/4-28 LH tap in their cabinet in the shop, if not then we go RHT for all helicoils & rod ends
to machine this week: pedalbox spacers, current susp spacer ID: 0.65 OD: 0.85 thickness: 0.064
make inboard tie rod spacers axial length = (0.505-0.375)/2 ID=0.25, OD=0.4”
lathe concentricity issues so only made pedalbox spacers and 3 tie rod spacers
6/17
machining
current susp spacer 4x per side, 16x total? ID: 0.625 OD: 0.85 thickness: 0.064 steel
part 1 more tie rod spacers axial length = 0.065+parting tool width
notes
stuff left to do from above: grooving, shocks, (pickle) check if old tie rods can be used as new toe rods for current susp, are we good for str wheel bolts (b&b)?, comp prep
UPDATE CA PLAN NUMBERS W MOST UPDATED CAD
6/18
drill 0.625" hole in rotary table piece, then bore & groove
me and gerard faced the 6 upper CAs, i did practice bore using rotary table and with boring bar, then did practice groove, then did actual bore and groove on one FU CA
gonna move daybreak later and get more truck hours w kellen and gerard
6/21
machining to dos
spacers (link to sheet)
rack extender
rack stopper
shave down rear shock extender cup
other to do
check rack extender bolt and test fit to ensure it twists tight. if not then gotta fix clevis
do rn
make cad for spacers
ensure theres cad for rack stopper/extender
figure out what amt to shave down extender by
dyn meeting notes
maybe need jam nut between rack and rack extender
make sure ergo meets regs
make sure rack extender bolt is properly safety wired
shock stuff
rebound setting: max - is most rebound (fastest), max + is slowest
the CAs that we have ready are RL and FU
pushrod to pushrod tab bolt needs to be at least 1.5" threaded length
unthreaded length <= 1.075"
need to decompress shocks to increase pushrod length, which needs to be done rn bc our ride height at 200psi is still like slightly under 100mm and that's without shell/ballast
pushrod tab to CA bolt unthreadd length <= 0.625" lock nut length = 0.3" so bolt length >= 0.925"
current walls inner are 0.57" apart, eliinating spacers would make it like 0.3725"
bolt hex head d=0.5" (wide) 0.435" (narrow)
Grooved last 2 upper CAs and 5 lower CAs. Chipped grooving too unfortunately
6/22
Did last grooving operation, drilled and tapped a few upper CAs, drilled and tapped some lower CAs, helicoiled a bunch, learned to break off tang using some pliers and then sanding, test thread the bolt, guided Josh and sohan with doing spacers and pushrods, discussed some steering stuff (extender / bolt) w Josh