Ducting
Project Overview
This project entails the creation of duct mounting and pathing for the cooling system. There are two front parallel ducts that alongside the middle horizontal tubing of the frame to the battery chamber. They interface with the nose intake at the front, and the rear radiator at the back. There are also two rear parallel ducts that run from the radiator to the rear exhausts.
Project Owner: Niteshwar Dhillon
Resources:
Mechanical Partner
The following are the systems and projects you’ll be working with or could have interferences with.
Nose Intake (Ava) → Nose Intake Project Owner
Body System → Frame Subsystem
Dynamics System → Front Suspension interferences
Aerodyanmics → Aeroshell interferences
Mechanical POCs:
@Harshit Dalmia - Mechanical Lead
@Matthew Murzaku - Aerodynamics Lead
@Abigail Uy - Frame Lead
Project Requirements
Duct Pathing
CAD Model
Duct Mounting
Subtasks
Pathing
Mount Creation
Interference Check
Review