Bottom Shell to Frame
blah blah blah synposis shit
Initial Goals:
do frame to shell all in one day so the shell does not flex
never unbolt
tab on the frame
pipe/hose clamp goes under the frame tab
hose clamp is easier to install since dont need to bolt
put something on shell to interface hose clamp on shell
pipe clamp is bolting into the shell
look at rated strength and see how many clamps it takes to support the whole shell
FOS of 3
Issues with previous shell to frame:
shell flexes anytime you add the bolts to the frame tab
mechanism relies on too much precision (20 bolt holes)