Wiki Updates Needed
This page will be a central location for noting needed Wiki updates and monitoring progress of current updates.
Add new desired improvements to the Next Up List at the end.
To avoid simultaneous editing that results in lost edits, coordinate with your partner if you're working on a section together.
When you finish updating a page, post the date and any notes on this page.
Pages Being Updated 2016
This will be an important page to check out, and help with updates soon!
The duration of maintenance prevented some planned updates while info was fresh
Assigned pages were based on who did what, knowledge, or volunteers
Unassigned pages need tribute
In Progress
Update etching manifesto Wiki - Kyle/Siff - (http://lase.mer.utexas.edu/wiki/index.php/Etching_Manifesto)
update removing Ga Turds - Kyle/Siff - (http://lase.mer.utexas.edu/wiki/index.php/Gallium_turds)
Update loading source material wiki - Kyle/Siff - (http://lase.mer.utexas.edu/wiki/index.php/Loading_Source_Material)
Update Idling cells wiki - AK - (http://lase.mer.utexas.edu/wiki/index.php/Idling_Cells_For_Opening)
Update Baking Cells Out wiki - Stephen w/ Kyle/Siff - (http://lase.mer.utexas.edu/wiki/index.php/Baking_Source_Cells)
create Facilities Maintenance page - Nate/Emily et al. - IP - (http://lase.mer.utexas.edu/wiki/index.php/Facilities_Maintenance)
Create: Rigaku XRD - Emily
RHEED Charging Page - AK - (make a page, pick a title)
Update AMV wiki - AK - (http://lase.mer.utexas.edu/wiki/index.php/All_Metal_Valve_Maintenance)
Create Starting Si on Echo - AK
Chamber Pressure Spikes
Mezzanine equipment
Echo E-beam QCM
Source Material Depletion - SDM
Ga cell depletion (w/ historical and recent data) - SDM/NTS/SDS
Al cell depletion (w/ historical and recent data) - AK/SDM+
Plots and Figures - SRB - (http://lase.mer.utexas.edu/wiki/index.php/Plots_and_Figures)
Need review
NEEDS REVIEW - Merge and update - Siff - (http://lase.mer.utexas.edu/wiki/index.php/Stuck_Group_III_Shutter &&& http://lase.mer.utexas.edu/wiki/index.php/Stuck_In_Shutter)
cryopump Recharge page update - Nate - IP - (http://lase.mer.utexas.edu/wiki/index.php/Cryopump_Recharge)
Dual Dopant Cell Outgassing Journal - Nate - IP - (http://lase.mer.utexas.edu/wiki/index.php/Dual_Dopant_Outgassing_Journal)
Wafer Tracking SOP - Nate - (http://lase.mer.utexas.edu/wiki/index.php/Wafer_Tracking)
Replacing the Echo B Shutter in a Glovebag Notes - Nate - (http://lase.mer.utexas.edu/wiki/index.php/Replacing_the_Echo_B_Shutter_in_a_Glovebag_notes)
Warming up the Substrate Heater from VCT - Siff (NTS) - (http://lase.mer.utexas.edu/wiki/index.php/Warming_up_the_Substrate_Heater_from_VCT)
Growth Section Pages Below
Completed
Update freezing Al wiki page - Nate - Done (http://lase.mer.utexas.edu/wiki/index.php/Melting_and_Freezing_Aluminum)
create/update page for viewports - Nate - Done (http://lase.mer.utexas.edu/wiki/index.php/Viewport_Replacement)
update leak checking procedure - Nate - Done (http://lase.mer.utexas.edu/wiki/index.php/Leak_Checking)
update BOS page - Nate - Done (http://lase.mer.utexas.edu/wiki/index.php/Bake_Out_System_%28BOS%29)
update Purchasing page sub-headers and table format - Nate - Done
Create/update Venting and pumping MBE systems page - Nate - Done - (http://lase.mer.utexas.edu/wiki/index.php/Venting_and_Pumping_the_MBE_System)
create bolts and gaskets - Nate - Done (http://lase.mer.utexas.edu/wiki/index.php/Bolts_and_Gaskets)
create Water Filter changing page - Nate - Done (http://lase.mer.utexas.edu/wiki/index.php/Water_Filters)
Create/update SF prep for glovebagging page - Nate - Done (http://lase.mer.utexas.edu/wiki/index.php?title=Source_Flange_Prep_for_Opening)
update Glovebagging page - Nate - Done (http://lase.mer.utexas.edu/wiki/index.php/Glovebagging)
Create/Update page for Al crucible - Nate - Done (http://lase.mer.utexas.edu/wiki/index.php/Replacing_Al_crucible)
Create/Update page for SF HVP - Nate - Done/could use pics next time (http://lase.mer.utexas.edu/wiki/index.php/Heated_Viewport_Replacement)
create cryo pump interlock page - Nate - Done (http://lase.mer.utexas.edu/wiki/index.php/Cryo_Pump_Interlock)
create Indium scraping page - Nate - Done (http://lase.mer.utexas.edu/wiki/index.php/Scraping_Indium_Pocket)
create Replacing_Indium_Shutter_in_a_Glovebag_Journal page - Nate - Done (http://lase.mer.utexas.edu/wiki/index.php/Replacing_a_Ta_In_Shutter_in_a_Glovebag_Journal)
create page for Wafer Bonder procedure - Nate - Done (http://lase.mer.utexas.edu/wiki/index.php/AML_Wafer_Bonder)
create page for MemReg Solder Transfer 2 procedure - Nate - Done (http://lase.mer.utexas.edu/wiki/index.php/Membrane_Regrowth_Process)
update citric acid etching procedure - Nate - Done (http://lase.mer.utexas.edu/wiki/index.php/Citric_Acid_Etch)
MBE pumpdown Crossover update - Siff - Done - (http://lase.mer.utexas.edu/wiki/index.php/Venting_and_Pumping_the_MBE_System)
BOS pumpdown Crossover update - Siff - Done - (http://lase.mer.utexas.edu/wiki/index.php/Venting_and_Pumping_the_BOS)
Update removing N2 station wiki - Nate - Done/ready for review (http://lase.mer.utexas.edu/wiki/index.php/Removing_the_Bravo_Nitrogen_System)
create Replacing_Shutter_in_a_Glovebag page - Nate - Done/ready for review - (http://lase.mer.utexas.edu/wiki/index.php/Replacing_a_Shutter_in_a_Glovebag)
Unexpected power outage - KMM (http://lase.mer.utexas.edu/wiki/index.php/Power_Outage_(Unplanned)
Create: Si (111) wafer prep - Emily - Done (http://lase.mer.utexas.edu/wiki/index.php/Prepping_Si_Wafers)
Re-org Cryo maintenance pages - Nate - Done
update Cryo Pump Maintenance page - Nate - Done
Created ion pump short fixing - Siff - Done - (http://lase.mer.utexas.edu/wiki/index.php/Ion_pump_hipotting)
Growths
Update Junk Growth - SDM + Auger
Nate 2015
Junk Growth (http://lase.mer.utexas.edu/wiki/index.php/Bravo_MBE_Junk_Growth)
GaAs RHEED Oscillations (http://lase.mer.utexas.edu/wiki/index.php/GaAs_RHEED_Oscillations)
There was an already existing page (from 2012) (http://lase.mer.utexas.edu/wiki/index.php/Group_V_Limited_RHEED_Oscillations) but it seems to be much less detailed and Sb limited specific.
Siff 2015
It is also for group-V (as you said Sb-specific) limited oscillations, whereas you were doing group-III limited oscillations. It is also possible to do AlAs RHEED oscillations on GaAs just as you did with GaAs today. Some specific comments on the wiki pages:
Junk Growth
6h) Note: Ideally, only RHEED block will go on first trolley position (where we hold it). Some users are more ambivalent. <-- The only real restriction is that this position be left empty when going into the load chamber. The standard is to put the RHEED block in this position because it will be in one place for the growth day, and if it were somewhere else then you will have to use it more often in the Tower of Hanoi games that get played out when shifting blocks around.
7c2) Transfer is 352 degrees.
GaAs RHEED Oscillations
You want the As needle valve open to supply an As BEP ~15x the Ga BEP.
The gain should be set to place the intensity in the oscillations window about half of full scale.
Nate 2016
Kyle had thoughts on these procedures as well.
If I recall, Seth also made a point about what Group III or V limited oscillations really meant.
Etc
Pages still not done from 2014
update - http://lase.mer.utexas.edu/wiki/index.php/Opening_Checklist
update - laser Testing Procedure - (http://lase.mer.utexas.edu/wiki/index.php/Laser_Testing_Procedure)
review Power Outage page - http://lase.mer.utexas.edu/wiki/index.php/Power_Outage_(Planned)
update Bravo (http://lase.mer.utexas.edu/wiki/index.php/System_Bravo)
update Echo (http://lase.mer.utexas.edu/wiki/index.php/System_Echo)
update Amber (more info, tips, hints, troubleshooting) - (http://lase.mer.utexas.edu/wiki/index.php/AMBER)
update the following:
create/update THz carrier lifetime station (http://lase.mer.utexas.edu/wiki/index.php/Carrier_Lifetime_Procedures)
create/update electrical probe station (http://lase.mer.utexas.edu/wiki/index.php?title=Probe_Station_Procedures&action=edit&redlink=1)
Notes
--There are recipes for ramp up and ramp down from April 21 and 22, 2016 on Bravo's Amber. The bake temperature is 1350 C. Bake til rollover, took 3 hours at temperature. We left it hot for longer. The cell was cooled off and is now under 30 C. --The BOS N2 line can be disconnected and taped to the BOS table in an obvious way, so we can use the line as an extra GC glovebag N2 source. It needs to be reconnected before venting the BOS.
Pages Being Updated 2014
Remember a page not listed under your section might have been entrusted to you.
This section can be ignored but should be saved.
Progress Plan 2014
7/14/14-7/21/14 – Comment period and create Wiki updates needed page. Look at which pages were delegated to you. I loosely organized them by Editor, search for your initials to ferret out all your pages. Look at the Wiki for yourself, especially wiki pages delegated to you. Read the How to Wiki page.
As I said, the work is split to harmonize with persons’ knowledge without overloading any one person. Many pages are assigned two people that can work together on the page in some manner. Most of these pages are created, but some are mislabeled, old, or ancient (circa SRB’s PhD). A few pages need to be created, in the appropriate place.
Use the How to Wiki page as an example of how to create a good wiki page. It has clear goals, sentences, organization, and images that add value. Ex: It is a page of guidelines and not a procedure, so it uses bullet points instead of numbers. Each page should be accurate and detailed enough to inspire confidence in a wavering mid-tier grad student.
Working on this transfer of knowledge will reduce pestering in the future and help the lab operation and maintenance cycles in the future. This is good for everyone.
7/14/14-7/28/14 – Start your editing. If you need help with editing, contact NTS. Note that because Kumar taught me how to wiki, we don’t pester him about it.
7/28/14-8/4/14 – Progress check and continue editing. NTS might be gone for most of August.
8/4/14-On - Continue
SJM+
Opening (misnamed) page update - SJM+KMM
Planned and Unplanned power failure pages are misnamed and from MW - SJM+KMM
NTS re-did Planned power failure from recent shutdown emails, please review
Amber update (more info, tips, hints, troubleshooting) - SJM+DJI
Cell bakeout - SJM+DJI
Stuck Group III shutter - SJM+SRB
Completed
Loading wafer page needs a facelift - SJM
RS+SDS
Laser mid-processing needs attn (+ metal stacks, wafer thinning and substrate lapping pages) - RS+SDS
Laser testing page creation - RS+SDS
Bravo page update - RS+SDS
Bravo growth procedure and idle update - RS+SDS
Melting and freezing Al - RS+SDS
NTS (Completed July 2015) (SDS please look over again)
THz carrier lifetime station creation - RS
Electrical probe station creation - RS+SDS
[edit]KMM+
Echo page update - KMM+ESW
Echo growth procdure and idle update - KMM+ESW
Taking off the Nitrogen system - KMM
Plumbing/filter maintenance page - KMM
DJI+
Scroll pump maintenance page upate - DJI
DONE by SDM, page is here
Scroll pump Spec page updates + tagging scroll pumps - DJI
DONE by SDM, page is here
Glovebagging update - DJI+NTS+AK
Go over my Venting the BOS and Prepping the BOS docs; Use these to make a Venting and Pumping the systems page - DJI+NTS+AK
SDM/VDD
Photoluminescence (PL) page needs testing and software sections and update - SDM + VDD
DONE
Transmission/Reflectance page - SDM
DONE
XRD procedure update - VDD
DONE
Etc.
cryo pump maintenance page we updated could use a clean up - NTS+SDS
Leakchecking (RGA) - SRB (completed by students over time)
UT Library info - SDS (completed July 11, 2014)
Sb refilling creation - AKR (Completed on 7/14/14)
As refilling update - NTS (Completed on 7/20/14)
Coral troubleshooting - NTS + SDS (Completed on 7/23/14)
Group Calendar page creation - NTS (Completed on 7/25/14)
Replacing Shutter Bellows creation - AKR (Completed on 8/08/14)
Purchasing page fixes and re-organization - NTS (Completed on 8/11/14)
Junk Growth - NTS (Completed May 2015, still needs editing)
RHEED Osc. - NTS (Completed May 2015, still needs editing)
Next Up List
Add what should be updated and the date you submit an update request.
Should we make a wiki page with all-metal valve info (location, torque spec, date, how to calibrate)? - Added 7/14/14