Auger System
Auger System Procedures (As of 04/18/2014)
Venting:
Turn off RGA electron multiplier, then the filament, then disconnect the RGA
Turn off RGA
Turn off ion gauge
Turn off mini-turbo pump if on, unclamp it and remove it from the system
Disconnect nitrogen line from desiccator, use foil to hold in place at all metal valve opening
Close gate valve to isolate ion pump
Slowly open all metal valve (Torque spec 50)
Pumping Down:
Re-attach mini-turbo. Start fore pump only.
When pressure < 100 Torr, turn on turbo as well
Wait for pressure to reach 5e-4 Torr (~2 hours)
Close all metal valve
Slowly open gate valve to ion pump, watching pressure. If pressure goes too high, ion pump will shut down.
Turn on ion gauge and RGA
Leak check