Growth Chamber

  1. Get a longer nipple for the Erbium cell and maybe look into getting an integrated shutter.

  2. Change source flange and cryo panel

  3. Change buffer gate valves

  4. Install 3-inch shutters and bellows when new source flange and cryo panel installed.

  5. Fix coated viewports (ex. the one facing Sb)

  6. Check thermocouple cable plugs for robustness

  7. Al eurotherm box thermocouple socket is glitchy

Buffer Chamber

  1. Replace broken pBN spring on heater station.

  2. Change the aluminum rail brackets for stainless steel ones.

Load Chamber

LN2 Tank (If Echo is also down)

  1. Close off supply line from LN2 tank to monitor tank consumption.